Is Planning Permission Required?
This is a guide for Wales, you should always check with your local planning authority for specific projects. Snowdon Domes is not responsible for any issues that may arise due to planning regulations.
New regulations came into force on 30 September 2013 which changed the building work which can be done without needing to apply for planning permission. The Welsh Government has produced a technical guide, and a householder guide to help you understand how permitted development rules might apply to your circumstances.
Rules governing outbuildings apply to sheds, greenhouses and garages as well as other ancillary garden buildings such as swimming pools, ponds, sauna cabins, kennels, enclosures (including tennis courts) and many other kinds of structure for a purpose incidental to the enjoyment of the dwelling house.
Other rules relate to the installation of a satellite dish, the erection of a new dwelling or the erection or provision of fuel storage tanks.
Outbuildings are considered to be permitted development, not needing planning permission, subject to the following limits and conditions:
Siting
The total area of ground covered by outbuildings cannot exceed 50% of the total area of the curtilage
Outbuildings cannot be located in front of the building line of the principal elevation
Outbuildings cannot extend beyond the side elevation of the house when the development would be any closer to a highway than the existing house, or at least 5 meters from the highway – whichever is nearest
Any part of the development within 2 meters of a boundary of the house cannot exceed a height of 2.5 meters
Any part of the development within 2 meters of the house cannot exceed a height of 1.5 meters
Height
Outbuildings cannot exceed more than one storey
The height of an outbuilding cannot exceed 4 meters when the building has more than one pitch (e.g. dual pitch and hipped roofs)
The height cannot exceed 3 meters when the building has a single pitch or other roof form
Flat roof buildings cannot exceed 2.5 meters in height
Eaves height of the building cannot exceed 2.5m
Listed buildings
You will need to apply for planning permission for construction of, or amendments to, any outbuildings within the curtilage of a listed building
Verandas, balconies and raised platforms
Verandas, balconies and raised platforms are not permitted where any part of the development would project more than 300mm above the surface of the ground below
*The term "original house" means the house as it was first built or as it stood on 1 July 1948 (if it was built before that date). Although you may not have built an extension to the house, a previous owner may have done so.
Please note: the permitted development allowances described here apply to houses not flats, maisonettes or other buildings.